
We removed the existing concrete/gravel driveway and installed a new resin drive consisting of type 3 permeable sub base, geotextile membrane, AC20 permeable asphalt and finished with a 20mm layer of Coastline Blend Resin Bound. This has greatly improved the property's kerb appeal and is SuDS compliant.
Length of Project: 1 Week
Mr Cable

.jpeg/:/cr=t:12.5%25,l:0%25,w:100%25,h:75%25/rs=w:370,h:370,cg:true)


.jpeg/:/cr=t:12.5%25,l:0%25,w:100%25,h:75%25/rs=w:370,h:370,cg:true)
