Groundworks for a new electrical kiosk, including excavation and installation of a dedicated electrical duct with draw rope and protective surround. A new concrete kiosk base was installed before the area was backfilled and reinstated. Existing block paving and slabs were carefully relaid, while disturbed grassed areas were levelled, soiled and reseeded, leaving the site clean, tidy and fully restored.
Length of Project: 4 Days
Gavin Simpson (Company Director)